Testing

Field Performance Testing, Certification & Verification

To ensure accurate documentation of testing, our test equipment is calibrated according to manufacturer specified intervals and traceable to NIST (documents available upon request). We strive to maintain the most efficient testing equipment to ensure precise and detailed results.

To view a complete list of our testing and certification services, please click each heading below to expand.

Cleanrooms, BSL3 Laboratories, and/or USP-797 Compliance Testing:
  • Non-viable particulate count survey
  • Viable particulate count survey (optional)
  • Room static pressurization readings (optional)
  • Terminal HEPA filter module air volume readings and/or calculations (optional)
  • Terminal HEPA filter module air velocity readings and/or calculations (optional)
  • Generated aerosol HEPA and/or ULPA filter leak testing (optional)
  • HEPA and/or ULPA filter leak scanning with no induced challenge (optional)
  • Room air change rate calculations (optional)
  • Temperature readings (optional)
  • Relative humidity readings (optional)
  • Sound level readings (optional)
  • Light level readings (optional)
  • Vibration levels (optional)
  • Airflow patterns (optional)
  • Recovery test (optional)
  • Comprehensive computer generated report
Biological Safety Cabinets (BSC’s)
  • Down flow velocity profiling
  • Inflow velocity profiling (calculated or measured)
  • Generated aerosol HEPA filter leak testing (supply & exhaust)
  • Airflow smoke pattern test
  • Site installation assessment test
  • Non-viable particulate count survey (optional)
  • Viable particulate count survey (optional)
  • Light level test (optional)
  • Sound level test (optional)
  • Ultraviolet light level test (not required by NSF)
  • Cabinet leak test (when applicable)
  • Electrical leakage, ground circuit resistance, and polarity test (optional)
Laminar Air Flow Workstations Or Devices (LAFW’s)
  • Airflow face velocity profiling
  • Generated aerosol HEPA filter leak testing
  • System volume profiling (when applicable)
  • Non-viable particulate count survey (when applicable)
  • Viable particulate count survey (when applicable)
  • Airflow smoke pattern test (when applicable)
  • Electrical leakage, ground circuit resistance, and polarity test (optional)
Compounding Aseptic (Containment) Isolators Units (CAI’s / CACI’s)
  • Airflow test (velocity profiling)
  • Chamber pressure test
  • Site installation assessment test
  • HEPA filter integrity test
  • Airflow smoke pattern test
  • Preparation ingress and egress test
  • Non-viable particulate count survey (when applicable)
  • Viable particulate count survey (when applicable)
  • Electrical leakage, ground circuit resistance, and polarity test (optional)
Chemical Fume Hoods
  • Inflow face velocity profiling
  • Airflow smoke pattern test
  • Generated aerosol HEPA filter leak testing (when applicable)
Gross Cutting Stations (GCS’s)
  • Inflow face velocity profiling
  • Industry standard pitot traverse
Animal Containment Caging and/or Changing Units (ACU’s)
  • Airflow face velocity profiling (when applicable)
  • Generated aerosol HEPA filter leak testing
Hepa Filtered Air Handling Systems and/or Enclosures (AHS’s)
  • Airflow velocity and/or volume profiling (when applicable)
  • Generated aerosol HEPA filter leak testing
Laminar Flow Surgical Suites
  • Airflow face velocity profile test
  • Generated aerosol HEPA and/or ULPA filter leak testing (optional)
  • HEPA and/or ULPA filter leak scanning with no induced challenge (optional)
  • Non-viable particulate count survey
  • Viable particulate count survey (optional)
  • Room pressurization (optional)
  • Temperature readings (optional)
  • Relative humidity readings (optional)
  • Sound level readings (optional)
  • Light level readings (optional)
  • Vibration levels (optional)
  • Airflow patterns (optional)
  • Recovery test (optional)
  • Comprehensive computer generated report